Building Connectivity for the Future
Ludhiana–Bathinda Greenfield Highway Project

lbgceigall 

SERVICES

Project Details

underline (project details)
Project Details lbg site

Project Name

Development of 6-lane access-controlled Ludhiana- Bathinda Greenfield highway section of NH-754AD from junction with Moga - Barnala Road (NH-703) near village Tallewal to junction with Delhi - Katra Expressway (NE-5) near Ludhiana (village Ballowal) (from km 30+300 to km 75+543) as a part of Ludhiana - Ajmer Economic Corridor in the state of Punjab on Hybrid Annuity Mode under Bharatmala Pariyojna Phase-I (Package-2).

ABOUT
pic 29.jpeg

About the Project:

underline (about project)

M/s Ceigall Ludhiana Bathinda Greenfield Highway Private Limited is a Special Purpose Vehicle (SPV) of Ceigall India Limited, incorporated for the execution of the Development of 6-lane Access-Controlled Ludhiana–Bathinda Greenfield Highway Section of NH-754AD (Package-2) in the State of Punjab.

Name of the Authority: National Highways Authority of India (NHAI)
Concession Agreement: Signed on 24th December 2024
Appointed Date: 29th September 2025
Stipulated Date of Completion: 28th September 2027
Construction Period: 730 Days
Mode of Execution: Hybrid Annuity Mode (HAM)
Independent Engineer: Chaitanya Projects Consultancy Pvt. Ltd.
IE Mobilization Date: 1st June 2025

The project involves the development of a 6-lane access-controlled Greenfield highway section of NH-754AD from the junction with Moga–Barnala Road (NH-703) near village Tallewal to the junction with Delhi–Katra Expressway (NE-5) near village Ballowal, Ludhiana, covering Km 30+300 to Km 75+543.
This stretch forms a key segment of the Ludhiana–Ajmer Economic Corridor under Bharatmala Pariyojana Phase–I and plays a vital role in enhancing connectivity, reducing travel time, and boosting economic and religious tourism across Punjab.

ABOUT

Project Highlights or Milestones:

underline (Project Highlights or Milestones)
Highlights:
  • Total Project Length: 45.243 km

  • Service Road Length: 18.464 km

  • Configuration: 6-Lane with Paved Shoulder

  • Total Project Cost: ₹981 Crores

  • Flyovers: 03 Nos.

  • Interchanges: 03 Nos.

  • Minor Bridges: 05 Nos.

  • Vehicular Underpasses: 01 No.

  • Light Vehicular / Pedestrian Underpasses: 20 Nos.

  • Small Vehicular / Pedestrian Underpasses: 25 Nos.

  • Vehicular Overpasses: 01 No.

  • Way Side Amenities: 03 Nos.

  • Toll Plazas: 02 Nos.​​

Milestones:
  • 1st Milestone: 150 Days – 26th February 2026

  • 2nd Milestone: 365 Days – 29th September 2026

  • 3rd Milestone: 550 Days – 2nd April 2027

  • 4th Milestone: 730 Days – 29th September 2027

Project Highlights or Milestones:
ABOUT
ceigall project photos

About Sponsor – Ceigall India Limited

underline (About Sponsor – Ceigall India Limited)

Ceigall India Limited (CIL) is one of India’s leading infrastructure construction companies, specializing in the execution of large-scale and technically complex projects across the nation. With proven expertise in highways, expressways, elevated corridors, bridges, flyovers, rail over-bridges, tunnels, and runways, Ceigall has established itself as a trusted name in the engineering and infrastructure sector.

CIL has successfully delivered over 37 projects, including 18 EPC, 2 HAM, 5 O&M, and 12 Item Rate projects in the roads and highways domain. These projects reflect Ceigall’s strong capability in delivering quality infrastructure with precision, safety, and efficiency.

At present, Ceigall is executing 26 major projects, comprising 13 EPC and 7 HAM projects, which include elevated corridors, expressways, bridges, flyovers, metro works, and multi-lane highways under various flagship programs such as the Bharatmala Pariyojana.

Renowned for its efficiency and execution excellence, Ceigall India Limited has a consistent track record of completing projects ahead of schedule, demonstrating its commitment to quality, innovation, and timely delivery. 

ABOUT

About Laboratory

underline (About Laboratory)

The Project Laboratory at Ceigall Ludhiana Bathinda Greenfield Highway (LBG–02) plays a critical role in ensuring the highest standards of quality control and assurance throughout project execution. The lab operates under the supervision of the Independent Engineer and in coordination with NHAI representatives, maintaining strict adherence to specifications and testing protocols.

Key laboratory activities include:

  • Conducting FDD (Field Density Determination) tests at site to verify pavement compaction levels.

  • Sampling and gradation testing of GSB materials to ensure compliance with approved mix designs.

  • Gradation analysis of WMM materials in coordination with the Independent Engineer.

  • Concrete cube strength testing witnessed by the Independent Engineer for structural quality validation.

  • Calibration of sand pouring cylinders and other field testing equipment to maintain accuracy.

  • Preparation of daily laboratory reports (DPRs) documenting all material testing and quality checks performed at site.

LAB PHOTOS.jpg

2025

Project Initiation Year

45.243km

Total Highway Length

6-lane

6 Lane with Paved Shoulder

150+

Workforce Deployed On-Site

PROJECTS

PROJECT GALLERY

underline (project gallery)

From the Director's Desk

Ramneek Sehgal

At Ceigall Ludhiana Bathinda Greenfield Highway Private Limited, we take immense pride in executing one of Punjab’s most significant infrastructure projects — the Development of 6-lane Access-Controlled Ludhiana–Bathinda Greenfield Highway Section of NH-754AD, under the Bharatmala Pariyojana Phase-I. This project stands as a testament to our commitment to engineering excellence, timely execution, and sustainable infrastructure growth.

As part of Ceigall India Limited, one of India’s fastest-growing EPC companies, we bring the same legacy of precision, innovation, and efficiency to this landmark initiative. Our focus remains steadfast on delivering quality, ensuring safety, and upholding our core values of integrity and performance.

This project not only strengthens regional connectivity but also contributes to Punjab’s economic and social development by enabling faster movement of goods, people, and opportunities. Backed by a dedicated team and the trust of our partners, we continue to push boundaries and set new benchmarks in infrastructure execution.

underline (ramneek sehgal)

Ramneek Sehgal

Chairman & Managing Director

CLIENT

underline (client)

The National Highways Authority of India (NHAI), under the Ministry of Road Transport and Highways, is the apex body responsible for the development, maintenance, and management of the National Highway network across India.
NHAI plays a pivotal role in implementing flagship programs like Bharatmala Pariyojana, driving large-scale infrastructure growth and enhancing connectivity nationwide.

CONTACT

underline (contact)

Inquiries

Ceigall India Ltd. Camp
Near Indian Oil Petrol Pump Raikot–Sudhar Road

(SH-13) Halwara – 141107

Registered Office

Contact Us

Corporate Office

underline (Get a quote)

Get a quote: +91- 6239641985

About

We are an infrastructure construction company with experience in undertaking specialized structural work such as elevated roads, flyovers, bridges, railway over bridges, tunnels, highways, expressways, runways, bus terminal and solar transmission.